AIE
Australian Institute o f Energy

Leadership in Energy

AIE Perth | Rottnest Islands’ Hybrid Power System

Venue: Rottnest Island

Date: Fri 21 Jun 2019 @ 10:20am to 5:00pm

ROTTNEST ISLANDS' HYBRID POWER SYSTEM

Rottnest island is not only a great holiday spot, it’s also a fully islanded (*groan*), high renewable penetration, multi-technology hybrid micro-grid, right here in the metro area. The island was historically reliant on liquid petroleum fuels but had a 600kW wind turbine installed in 2004 and then a 600kW solar PV array added in 2017. The three generation sources are integrated with a micro-grid controller developed by Hydro Tasmania based on its experience at King Island in the Bass Strait.

Live operational data from the system is available here for those who can’t wait: https://www.hydro.com.au/clean-energy/hybrid-energy-solutions/success-stories/rottnest-island

What The Site Visit Includes:

This site visit will tour via bus to the wind turbine and solar array and include a presentation from operators on the island.

Registration also includes a light lunch at Hotel Rottnest upon arrival at the island, as well as snacks and your first drink at the end of the day followed by a cash bar.

Unfortunately refunds will not be possible, due to booking commitments.

TIMETABLE FOR THE DAY
10:20am - Meeting at Perth Train Station OR
11:10am - Meeting at Fremantle B Shed

5:00pm - Returning To Fremantle B Shed
[Transportation cost to Fremantle is not included]


DIFFERENTIAL PRICING FOR THIS SITE VISIT
$75 AIE Members (Inc GST)
$125 Non-Members (Inc GST)
[Includes Ferry To Rottnest]

Want To Stay Longer & Book Your Own Ferry Across?
$15 AIE Members (Inc GST)
$65 Non-Members (Inc GST)

Registrations for this event are now closed

 


< Back